Login

OR
Don't have an account?

Sign Up

5 free AI credits included

No credit card required

By signing up, you agree to our Terms of Service and Privacy Policy.

OR
Already have an account?

How to Do a Work Inventory: Build the Sheet, Then Turn It Into a Process Flowchart

Published 13 min read
A hand writing a checklist in a notebook

"Could you write down everything we do around here?" Your boss asks, you open Excel — and then you freeze. Which columns do you need? How much detail is enough?

A work inventory is something one person can run, as long as you keep the columns to a minimum. And if you decide up front which rows you'll dig into and how, the inventory becomes the starting point for real improvement instead of a list that sits in a folder.

This article walks through a fictional small company to show how to build an inventory sheet (with a filled-in example), the 5 steps to run it, and how to turn one row of the sheet into a process flowchart.

What you will learn

  • What a work inventory is for, and how it differs from a process flowchart and a work manual
  • The 5 basic columns that a small company can realistically keep up, with a filled-in example
  • 5 steps to run a work inventory on your own, and how detailed each row should be
  • How to pick which tasks to map, and how to open one row into a flowchart

What Is a Work Inventory? Its Purpose and 3 Uses

A work inventory is a list of every task your company or team performs, laid out so you can see who does each one, how often, and how much time it takes.

Taking stock of your work, the way you'd count stock

Just as a stocktake counts the goods on your warehouse shelves, a work inventory counts the tasks in your business, one at a time. It has nothing to do with inventory management for products, so when you bring it up internally, calling it a "work inventory" or "task inventory" keeps people from mixing the two up.

Three uses for a work inventory

  • A starting point for improvement: you see how many hours a year go into each task, so you can decide what to tackle first
  • Preparing for handovers and time off: tasks only one person handles show up at a glance, so you can act before someone moves roles or leaves
  • Finding where automation or AI fits: it gives you the raw material to answer "we don't know what to use it for"

Inventory sheet vs. process flowchart vs. work manual

ToolQuestion it answersUnitBest for
Inventory sheetWhat work is there, and how much of it?One task per rowGrasping the overall volume and who owns what
Process flowchartHow does that work flow?Steps and hand-offsSpotting waiting and rework
Work manualHow do you do one step?Step-by-step procedureDelegating and training

Use them in this order: inventory sheet → process flowchart → work manual. Of the six steps in our "How to Improve Business Processes" guide, the inventory comes just before the step where you map the current process as a flowchart — it's how you decide which process to map. For drawing flowcharts, see "How to Map a Business Process Flow"; for manuals, see "How to Write a Work Manual."

Process improvement lead

Minami

Process improvement lead

Writing down every single task sounds like it'd take weeks on its own... Honestly, is it even worth it?

DrillSpark consultant

Spark

DrillSpark consultant

You don't need to get everything perfect on the first pass. The point is to learn where the time goes and which tasks only one person can do. For that, five columns are plenty.

How to Build a Work Inventory Sheet: Small Companies Start With 5 Columns

If one or two people are running the inventory, five columns — Task, Owner, Frequency, Time per occurrence, and Hands off to — plus a calculated Annual hours column are all you need to start.

The 5 basic columns, plus 1 calculated column

ColumnWhat to writeExample
TaskWhat gets done, written with a verbIssue invoices
OwnerWho mainly does it. If it's only one person, make that visibleAdmin B (sole owner)
FrequencyDaily, weekly, monthly, as needed, etc.Monthly (month-end)
Time per occurrenceIn minutes. The owner's rough estimate is fine720 min (12 hours)
Hands off toThe person, team, or outside party the work goes to next. List them in order if there are severalSales → President → Customer
Annual hours (calculated)Time per occurrence × times per year, calculated with an Excel formula144 hours

The most important column in this sheet is Hands off to. When you later open a row into a process flowchart, the order of the people you listed becomes the steps and the hand-off arrows.

A column layout you can use in Excel as-is, and the annual-hours formula

In row 1 of your spreadsheet, enter these headings starting from column A: Task / Owner / Frequency (times per year) / Time per occurrence (min) / Hands off to / Annual hours. In the frequency column, enter the number of times per year as a number — 240 for daily (working days), 52 for weekly, 12 for monthly — so a formula can do the math.

In cell F2, enter =C2*D2/60 and copy it down. For example, a 45-minute task done every day (240 times) comes to 45 × 240 ÷ 60 = 180 hours.

Columns to add if you have room

ColumnWhat it tells you
Backup owner (who can cover)Whether the work stops when the owner is out
Major / middle / minor categoryHow tasks group together; makes comparing across teams easier
Tools and documents usedSystem names, Excel, paper, etc. Useful when hunting for automation candidates
Pain pointsA comment from the owner. A clue for improvement
Improvement directionEliminate, combine, rearrange, or simplify

A guide by Bayes Management, a Japanese firm, shows an example sheet with 11 fields: task category, major, middle, and minor category, main owner, backup owner, frequency, time per occurrence, annual hours, whether someone else can cover, and improvement action. If only one or two of you are doing this, you're far more likely to finish if you go around once with 5 columns and add what you need on the second pass.

Filled-in example: 8 admin and accounting tasks at a kitchen equipment distributor

Take a 12-person company that sells commercial kitchen equipment (a fictional example), where Admin B inventories the admin and accounting work single-handedly. The admin team is just B and C, and the president handles payroll personally.

TaskOwnerFrequencyTime per occurrenceHands off toAnnual hours
Issue invoicesAdmin B (sole owner)Monthly (12)12 hoursSales (checks content; may send back) → President (approves) → Customer144 hours
Enter orders into the sales systemAdmin C (sole owner)Daily (240)45 minWarehouse180 hours
Answer and route incoming callsEveryone, in rotationDaily (240)60 min totalWhoever the call is for240 hours
Check and reconcile incoming paymentsAdmin B (sole owner)Weekly (52)90 minPresident (report)78 hours
Run payrollPresident (sole owner)Monthly (12)4 hoursOutside labor and social insurance consultant (sharoushi)48 hours
Check expense claimsAdmin B (sole owner)Monthly (12)3 hoursPresident (approves) → Claimant (payment). Incomplete claims go back to the claimant36 hours
Prepare the weekly sales reportSales D (sole owner)Weekly (52)30 minPresident26 hours
Order office suppliesAdmin C (sole owner)Twice a month (24)30 minSupplier12 hours

The example spells out frequency and time in words to make it easy to read, but in Excel you enter numbers only so the formula works. For "Issue invoices," that means 12 in the frequency column (C) and 720 (minutes) in the time column (D).

The 8 tasks add up to 764 hours a year. Sorted by annual hours, the small daily tasks (answering calls at 240 hours, order entry at 180 hours) turn out to weigh more than the big monthly job of issuing invoices (144 hours). Noticing that the work that looks hard and the work that actually eats time are not the same is the first discovery an inventory gives you.

In the example, follow the Hands off to column on the "Issue invoices" row and you have the flow of the work. Write the task and its hand-offs as a sentence, give it to AI, and you get a first draft of a process flowchart.

How to Do a Work Inventory in 5 Steps, Even on Your Own

Run a work inventory in 5 steps: set the scope and purpose → draft it yourself → spend 15 minutes with each owner → sort by annual hours → pick the task to map as a flowchart.

Figure 1: The 5 steps of a work inventory. It ends not with a table but with one task mapped as a flowchart
Diagram contents (text)

Items in the diagram

  1. Start the inventory
  2. Set scope and purpose in one sentence
  3. Draft it yourself from your records
  4. Correct it with 15 minutes per owner
  5. Calculate annual hours and sort
  6. Any rows that meet the 3 criteria?
  7. Pick the row that meets the most
  8. Widen the scope and add tasks
  9. Map the chosen task as a flowchart

Flow (arrows)

  • Start the inventory → Set scope and purpose in one sentence
  • Set scope and purpose in one sentence → Draft it yourself from your records
  • Draft it yourself from your records → Correct it with 15 minutes per owner
  • Correct it with 15 minutes per owner → Calculate annual hours and sort
  • Calculate annual hours and sort → Any rows that meet the 3 criteria?
  • Any rows that meet the 3 criteria? → (Yes) → Pick the row that meets the most
  • Any rows that meet the 3 criteria? → (No) → Widen the scope and add tasks
  • Widen the scope and add tasks → Draft it yourself from your records
  • Pick the row that meets the most → Map the chosen task as a flowchart

Step 1: Set the scope and purpose

Start by drawing the boundary around a department, such as "admin and accounting tasks." For your first round, pick a scope that fits into roughly 8 to 20 tasks, so one person can see it through to the end.

Set the purpose in one sentence too — for example, "Find the tasks only one person handles, to prepare for handovers," or "Improve the tasks with the most annual hours first." With a clear purpose, you won't hesitate later over which columns to add or which rows to pick.

Step 2: Draft it yourself from your calendar and records

If you write from memory alone, you'll list mostly daily tasks. Go back through one to two months of dated records — your calendar, sent emails, copies of invoices and slips — and far less will slip through. Month-end-only and once-a-year tasks are especially easy to miss, so always check your calendar around month-end and fiscal year-end.

Step 3: Spend just 15 minutes with each owner to correct it

Handing everyone a blank sheet to fill in tends to stall at a busy small company. Show people the draft you made and ask, "Just tell me what's wrong and what's missing" — that takes about 15 minutes per person. Limit yourself to these three questions.

  1. Is there anything you do only at month-end, year-end, or during the annual closing?
  2. If you were out for a week, which of your tasks would stop?
  3. Who do you get that work from, and who do you pass it to? Does it ever come back to you partway through?

The answers to the third question go straight into the Hands off to column. For tasks where the answer is "it comes back," jot "may send back" next to that person — you'll use it later when choosing which row to map. In the example company, Admin B's draft, done in half a day, had only 6 tasks. After 15 minutes each with the president, Admin C, and Sales D (45 minutes in total), "Check expense claims" and "Order office supplies" were added, bringing it to 8.

Step 4: Calculate annual hours and sort

Once the formula has calculated annual hours for every row, sort the sheet from the largest to the smallest. At the same time, color the rows where the Owner column says "sole owner," so they stand out in the next step. In the example, the top 3 rows alone (240, 180, and 144 hours) totaled 564 hours — more than 70% of all 8 tasks.

Step 5: Pick the task to map as a flowchart

From the sorted sheet, choose one row to turn into a process flowchart. The three criteria for choosing are explained in a later section, applied to the example. If no row meets any of them, widen the scope to the neighboring department and add more tasks. The trick to turning an inventory into improvement is not stopping at the sheet: put "map one row as a diagram" on the schedule from the start.

Process improvement lead

Minami

Process improvement lead

Everyone's so busy — if I hand out a sheet, I don't think I'll get it back...

DrillSpark consultant

Spark

DrillSpark consultant

That's why you draft it yourself first and just ask them, "Tell me what's wrong." That's much easier to answer than filling in a blank sheet. Fifteen minutes a person — even busy people will give you that.

Our "What Is ECRS?" guide lists "inventory and visualize the work" as the first step in applying ECRS. The 5 steps here break that first step down, up to the point where you have the sheet.

How Detailed Should You Get? 3 Rules of Thumb for Granularity

Aim for each row to be a task you could hand to someone else as-is. Any coarser and you can't fill in time or owner; any finer and the rows multiply until the inventory stalls.

Rule 1: Split at the level you could hand over to someone else

The Bayes Management guide also suggests breaking the finest category down to a unit you could hand over to someone. "Recruiting" is too coarse to give anyone, but "Schedule interviews with applicants" is something another person could take over tomorrow.

Rule 2: Write with a verb, not "…handling" or "…related"

Entries like "Client handling" or "Accounting-related" mean different things to different people. Write it down to the verb — "Answer quote requests from clients," "Check and reconcile incoming payments" — and the scope of the row becomes clear, and the time per occurrence gets easier to answer.

Rule 3: Group tasks into three levels: major, middle, minor

Once you pass about 20 rows, grouping by category makes the sheet easier to read. A guide from Teachme Biz, a Japanese manual-creation tool, describes one way to split it: major categories for work done company-wide, middle categories for work shared within a department, and minor categories for an individual's tasks. Each row of the inventory sheet is a minor category.

As a rule of thumb for this article, don't give tiny tasks that take less than 5 minutes their own row; fold them into the row above. For example, "Print the invoice address labels" belongs inside the "Issue invoices" row.

LevelExampleProblem
Too coarseAccounting workNo single owner, frequency, or time — you can't fill it in
Too finePrint the invoice address labelsHundreds of rows; you stall partway
Just rightIssue invoicesOne owner, frequency, and time
Figure 2: How the sheet's major, middle, and minor categories relate to a flowchart's steps and lower levels. The sheet goes down to minor categories; finer procedures live inside the diagram
Diagram contents (text)

Items in the diagram

  1. Major category: Accounting
  2. Middle category: Sales management
  3. Minor category: Issue invoices
  4. Flowchart: The invoicing process
  5. Step: Sales checks the content
  6. Lower level: How to check and when to send back

Flow (arrows)

  • Major category: Accounting → Middle category: Sales management
  • Middle category: Sales management → Minor category: Issue invoices
  • Minor category: Issue invoices → Flowchart: The invoicing process
  • Flowchart: The invoicing process → Step: Sales checks the content
  • Step: Sales checks the content → Lower level: How to check and when to send back

Procedures finer than a minor category belong inside the process flowchart, not the sheet. In DrillSpark, you can create a lower level (sub-process) under any step in a diagram and drill down into it, so the levels of your sheet and your diagrams line up: one row in the sheet → one diagram → the detailed procedure for each step.

Process improvement lead

Minami

Process improvement lead

I figured more detail meant more accuracy, so I split one task into 20 rows... and now I'll never finish.

DrillSpark consultant

Spark

DrillSpark consultant

The sheet has done its job once it shows which tasks take the time. Write the detailed procedures only for the tasks you pick, in a flowchart and a manual. Keep the sheet coarse and the diagram detailed — that's how you keep going.

3 Criteria for Choosing Which Tasks to Map as a Flowchart

Map the rows that meet the most of these three criteria: high annual hours, a single owner, and two or more hand-offs or send-backs. You don't need to map every row — one row is plenty for your first diagram.

Criterion 1: High annual hours

The more annual hours a task takes, the bigger the payoff from improving it. Cut a 180-hour-a-year task by 10% and you save 18 hours a year; do the same to a 12-hour task and you save 1.2 hours. For the same effort, start from the top rows.

Criterion 2: A single owner

A task with only one owner may stop if that person is out or leaves. Note, though, that the 5-column sheet only records who does the work; whether nobody else can cover it only becomes clear once you add a backup-owner column. Ways to deal with work concentrated on one person are covered in "How to Reduce Key-Person Dependency."

Criterion 3: Two or more hand-offs, or send-backs

Tasks that pass through two or more people, or that get sent back partway, tend to pick up waiting time between hand-offs. That waiting and rework is invisible in a single row and only shows up once you draw the flow, which makes these the rows most worth mapping. For send-backs, use the notes you made in the Hands off to column from the third question in Step 3.

Applying the criteria to the 8 example tasks

TaskTop 3 in annual hoursSingle owner2+ hand-offs or send-backsCriteria met
Issue invoicesYes (144 hours, #3)YesYes (Sales, President, Customer; errors sent back)3
Enter orders into the sales systemYes (180 hours, #2)Yes—2
Check expense claims—YesYes (President, Claimant; incomplete claims sent back)2
Check and reconcile incoming payments—Yes—1
Answer and route incoming callsYes (240 hours, #1)——1
Run payroll—Yes (President)—1
Prepare the weekly sales report—Yes—1
Order office supplies—Yes—1

At this company, 7 of the 8 tasks had a single owner. Only "Issue invoices" meets all three criteria, so that becomes the first diagram. Candidates for the second are the two tasks that meet two: "Enter orders into the sales system" or "Check expense claims."

Answering incoming calls, which has the most annual hours, is shared by everyone and follows a simple flow. Rather than mapping it, the question there is "Can we reduce the number of calls?" or "Can we automate it?" — how to make that call is covered in "How to Choose Which Tasks to Automate."

Make your first diagram a task that meets all three criteria. The results of improving it are easy to see, and they'll help you make the case for moving on to the next task.

Opening One Row Into a Process Flowchart in 4 Steps: The Invoicing Example

Line up the chosen row's Hands off to entries in order, then add branches, send-backs, and the time for each step — and one row becomes one process flowchart. Let's walk through it with the example's "Issue invoices" row (144 hours a year, 12 hours each time).

Step 1: Line up the Hands off to entries as the skeleton

Take "Sales (checks content; may send back) → President (approves) → Customer" from the sheet, add the person who starts the work and the person who produces it, and you get the skeleton "Sales → Admin → Sales → President → Customer." Write what each person does before passing it on, using a verb, and each one becomes a step box.

Step 2: Ask "What happens when it doesn't go smoothly?" to add branches and send-backs

With the skeleton in place, ask the owner, "Is there anywhere along the way where things go wrong?" At the example company, when Sales found an error in an amount or address, the invoice went back to Admin to be redone. Asking how many clients this affects each month turned up an average of 6 out of 40. Invoices also went out two ways: by post and by email.

Figure 3: The "Issue invoices" row from the inventory sheet, opened into a process flowchart. The Hands off to column becomes the order of the steps
Diagram contents (text)

Items in the diagram

  1. Month-end close
  2. Sales shares delivery details with admin
  3. Admin creates invoices in the sales software
  4. Sales checks the content
  5. Error in amount or address?
  6. Admin corrects and reissues
  7. President approves the amounts
  8. How to send?
  9. Print, enclose, and mail
  10. Email the PDF
  11. Invoicing complete

Flow (arrows)

  • Month-end close → Sales shares delivery details with admin
  • Sales shares delivery details with admin → Admin creates invoices in the sales software
  • Admin creates invoices in the sales software → Sales checks the content
  • Sales checks the content → Error in amount or address?
  • Error in amount or address? → (Yes) → Admin corrects and reissues
  • Admin corrects and reissues → Sales checks the content
  • Error in amount or address? → (No) → President approves the amounts
  • President approves the amounts → How to send?
  • How to send? → (Post) → Print, enclose, and mail
  • How to send? → (Email) → Email the PDF
  • Print, enclose, and mail → Invoicing complete
  • Email the PDF → Invoicing complete

Step 3: Add working time and waiting time for each step

Break down the "12 hours each time" from the sheet by asking which steps use it. While you're at it, ask how long each step waits before the next person picks it up.

StepWhoWorking timeWaiting
Collect delivery details and create invoicesAdmin B6 hours—
Get Sales to check themAdmin B, Sales1 hour2 days on average (Sales out on visits)
Fix send-backs and reissue (6 clients/month × 30 min)Admin B3 hours—
Get the president's approvalAdmin B30 min1 day
Print, enclose, and mail; send by emailAdmin B1 hour 30 min—
Total12 hoursAbout 3 days

Three of the 12 hours — a quarter — went into redoing invoices that were sent back. What had been a single row on the sheet, "Issue invoices: 12 hours," only showed what was inside it once it was drawn as a flow.

Step 4: Decide your next move from the diagram

What you find in the diagram determines which method to use next. The guides covering each method explain how to take it from here.

What the diagram showedNext moveGuide that covers it
3 hours a month spent redoing sent-back invoicesDig into why the errors happenHow to Run a 5 Whys Analysis
An average 2-day wait for Sales to checkLook for waste such as waiting and re-keyingThe 7 Wastes in Office Work
The order of checking and approval, and whether both are even neededConsider eliminating and combining firstWhat Is ECRS?
The flow after improvementDraw the improved diagram and compare it with today'sHow to Do an As-Is/To-Be Analysis
Process improvement lead

Minami

Process improvement lead

On the sheet it just said "Invoices: 12 hours," but once we drew it, 3 of those hours were going into redoing invoices that got sent back!

DrillSpark consultant

Spark

DrillSpark consultant

Exactly. The sheet tells you where to look, and the diagram tells you why it takes so long. So don't stop an inventory at the sheet — take at least one row all the way to a diagram.

4 Common Work Inventory Mistakes and How to Avoid Them

Most work inventories go wrong for one of four reasons: the sheet is the finish line, the detail gets too fine, owners aren't asked, or it's done once and never updated.

MistakeWhat happensFix
Stopping once the sheet is doneYou have a list, but nothing changesFrom the start, schedule "pick one row with the 3 criteria and map it"
Getting so detailed you never finishHundreds of rows; you stall partwayOne row = something you could hand to someone else. Only 5 columns on the first pass
Writing it without asking the ownersMonth-end and once-a-year tasks, and hand-offs, get missedShow your draft and correct it with 15 minutes and 3 questions per person
Making it once and never updating itRole changes and new systems make the sheet go staleSet review dates, and update it whenever people or systems change

Mistake 1: Stopping once the sheet is done

Once the sheet exists, just seeing all the work in one list feels like an achievement. But the sheet only tells you where to look — not why things take so long. When you start the inventory, put a date on the diagram too, such as "map one row as a process flowchart within a week of finishing the sheet."

Mistake 2: Getting so detailed you never finish

The harder you try to be precise, the more rows you add — and what was meant to be 20 tasks turns into 200 rows and grinds to a halt. Keep every row at the size of something you could hand to someone else as-is, and on the first pass focus on filling in just the 5 basic columns. Detailed procedures only need to be written inside the diagrams for the tasks you pick.

Mistake 3: Writing it without asking the owners

If you build the sheet only from the work you can see yourself, you'll miss month-end and once-a-year tasks and hand-offs with other people. In the example, too, interviews added 2 tasks to the 6 in the draft. The question "If you were out for a week, which of your tasks would stop?" also helps you find tasks only one person handles.

Mistake 4: Making it once and never updating it

Work changes as people move roles and new systems come in. Set review dates in advance — every quarter, or at the start of each fiscal year. On top of that, whenever an owner changes or you switch software, update just those rows, and the sheet won't go stale.

Summary: Once the Sheet Is Done, Map One Row as a Process Flowchart

A work inventory is one package: grasp the volume of work with a 5-column sheet, then map one row, chosen with the 3 criteria, as a diagram.

Key takeaways

  • Start the sheet with 5 columns — Task, Owner, Frequency, Time per occurrence, Hands off to — plus a calculated Annual hours column
  • Draft it yourself, then correct it with just 15 minutes per owner
  • Size each row as something you could hand to someone else as-is
  • Choose which rows to map with 3 criteria: high annual hours, a single owner, and two or more hand-offs or send-backs
  • Follow the Hands off to column on the chosen row and it becomes a process flowchart

An inventory sheet is like a map of your company's work. Once the map shows you where to go, the next job is to look at that spot up close — and that's the process flowchart. Open one row into a diagram, and time the sheet couldn't show, like waiting and rework, comes into view.

With DrillSpark, describe a process in plain language and AI drafts a flowchart that you can refine through conversation. There's a free plan, and no credit card is required.

Start by picking the row on your sheet that met the most criteria, and turn that one task into a diagram.

Related Templates

Related Guides

How to Improve Business Processes: 6 Steps and Key Frameworks

A practical guide to business process improvement: a 6-step method starting with process mapping, plus how to use ECRS, PDCA, 5W1H, and QCD frameworks.

How to Map a Business Process Flow: 5 Steps and Examples

Learn how to map a business process flow in 5 steps — symbols, layout rules, and real examples by department. Start with templates and AI generation today.

How to Do an As-Is/To-Be Analysis: Map the Current and Future State Side by Side

Learn As-Is/To-Be analysis with two process maps of one expense workflow: 6 steps to build the To-Be with ECRS, BPR vs. improvement, and 3 metrics to measure.

How to Reduce Key-Person Dependency: Find the Risky Work and Standardize It, Judgment Calls Included

Reduce key-person dependency: use a 7-point checklist to spot risky tasks, turn a veteran's unwritten judgment into flowchart branches, and make it stick.

The 7 Wastes in Office Work, Plus Muri and Mura: How to Find Them on a Flowchart

What do the factory's 7 wastes look like in office work? A table of office examples, 5 steps to find muda, mura, and muri on a flowchart, and common mistakes.

What Is ECRS? The 4 Principles of Process Improvement, With Examples

ECRS improves any process via four principles applied in order: Eliminate, Combine, Rearrange, Simplify. Examples, a 5-step rollout, real cases, AI-era tips.

How to Run a 5 Whys Analysis: Blame-Free Questions and an Office Error Example

Run a 5 Whys analysis that reaches process causes, not blame: 5 steps, question rewrites, an invoice mix-up example, 3 types of fixes, and a report format.

How to Choose Which Tasks to Automate: 5 Criteria for RPA and AI, and Where to Keep Human Checks

Pick tasks to automate by 5 criteria: volume, steps, input, impact, lifespan. Learn RPA vs. AI, what to cut first, and where to keep human checks.

How to Write a Work Manual: 6 Steps and Writing Tips

How to create a work manual in 6 steps: how it differs from a process flow, 7 writing tips for clarity, and how to keep it alive after launch.

FAQ

What columns does a work inventory template need?
If one or two people are running it, five columns — Task, Owner, Frequency, Time per occurrence, and Hands off to — plus a calculated Annual hours column are enough. Enter frequency as times per year (240 for daily, 52 for weekly, 12 for monthly) and an Excel formula can calculate annual hours. Add columns such as backup owner, major/middle/minor category, and tools used on the second pass, only as you need them.
How detailed should a work inventory be?
Aim for a task you could hand to someone else as-is. Instead of "Client handling," write it down to the verb, like "Answer quote requests from clients." Fold tasks that take less than 5 minutes into the row above, and write detailed procedures in a process flowchart or manual, not the sheet.
How long does a work inventory take?
It varies a lot with the scope and the number of people. Rather than handing out a sheet for everyone to fill in, drafting it yourself and correcting it with about 15 minutes per owner is less likely to stall at a busy small company, and gets you to a draft in less time. Limiting your first round to one department and roughly 8 to 20 tasks makes it easier to plan.
How do I do a personal work inventory?
Use the same 5 columns to write down your own work over one to two weeks. Pulling from your calendar and sent emails keeps things from slipping through; for month-end and once-a-year tasks, go back through past calendars. It's also useful when preparing for a role change or handover, or for looking back before a performance review.
What should I do after the work inventory is finished?
Choose one row using the 3 criteria — high annual hours, a single owner, and two or more hand-offs or send-backs — and map it as a process flowchart. Once the diagram shows waiting and send-backs, work out improvements in ECRS order: Eliminate → Combine → Rearrange → Simplify.

Turn your own process into a flowchart

Describe your process and AI drafts the flowchart for you. Free, no credit card required.

Sign Up

5 free AI credits included

No credit card required

By signing up, you agree to our Terms of Service and Privacy Policy.

OR
Already have an account?

Confirm